|
|
Attention all roofers:
- #15 lb. felt is required under all new and stripped roofs.
- A strip of ice and water type membrane is required on all eave edges. It
shall extend from the eave's edge to a point at least 24 inches inside the
exterior wall line of the building.
- Asphalt shingles shall have the minimum number of fasteners as required by the manufacturer.
- During the process of your roofing job, please call for an inspection to verify these Building Code requirements.
|
|